Thousand Oaks Brush Creek Connector Trail

Parkville, MO

RIC designed 3,500 linear feet of 10’ concrete trail to provide connection from the Thousand Oaks Subdivision to the existing Brush Creek Trail. The project included culvert design, FEMA floodplain modeling, and the design of a pedestrian bridge over Brush Creek. The project also included landscape architecture, parking lot rehabilitation and striping, utility coordination, and part time construction inspection.

Markets